NDIS, Aged Care & Private · Home mods · Assistive tech · Smart home · SecurityMon–Sat 9am–6pm04888 NEMCO
GROUPSMART. SAFE. SECURE.
Guides · 10 min · 6 November 2026

Coming home from hospital: the 10-day plan to get the house ready

A discharge date is on the calendar and the house is not ready. Here is what to fix first, who to call, and how to get the essentials done without panic.

Older woman being wheeled along a hospital corridor
The short version
  • Start with the route the person will use on day one: entry, bed, toilet, shower, kitchen. Fix those first.
  • Ask the hospital team three things early: the expected date, whether an OT home visit is planned, and what equipment they will organise.
  • Temporary solutions (hired equipment, portable ramps, rails fixed without major work) buy time while permanent changes are planned.
  • A discharge date can move. A good plan works whether it is in 3 days or 13.

A discharge date has a way of arriving faster than the paperwork. Maybe it is a hip replacement, a stroke, a fall, a long illness. The hospital is ready to send someone home, and the home may not be. This guide is for the family member, partner or friend who has just been told "probably Thursday" and is now looking at a bathroom with a shower hob and a front door with three steps.

Take a breath. You do not have to fix the whole house. You have to make one safe route work on day one, and then build from there.

Not medical advice

Your hospital team knows the person's needs. This guide is general information to help you ask better questions and plan the practical side. Follow the team's instructions on mobility, weight bearing and equipment.

Day 10 to day 8: ask the right questions before anything else

Before you buy a single thing, get answers from the people who know the clinical picture. The ward OT, physiotherapist, nurse unit manager or discharge planner can usually tell you what you need to know. A few questions save a lot of wasted effort:

  1. What is the expected discharge date, and how firm is it?

    Dates move. Ask what would change it so you can prepare for early or late.

  2. What mobility aids will the person use at home?

    A walking frame, wheelie walker, wheelchair or commode all need different amounts of space. Doorway width and turning room depend on the answer.

  3. Will an occupational therapist do a home visit or review photos?

    A home visit, or photos and measurements you send in, helps the OT recommend equipment and changes that suit the real house, not an imagined one.

  4. What equipment will the hospital organise, and what do we arrange?

    Some items may be supplied, loaned or prescribed. Others you may need to hire or buy. Get a list in writing if you can.

  5. Who is the contact after discharge?

    A community nurse, a care coordinator or a GP. Write down names and numbers before the day arrives.

Day 8 to day 5: walk the route with a tape measure

Now do a walk-through of the home as the person will experience it, starting at the car and ending at the bed. Take photos and measurements as you go. They are what the OT, a supplier or a tradie will ask for first.

Count the steps and measure the height of each one. Note the door width and whether there is a threshold. Is there a handrail? Is the path lit? If the person will use a frame or wheelchair, a short ramp or a rail at the door may be the single most useful early change.

Check the bed height. Can the person sit on the edge with their feet flat on the floor? Is there room to turn a frame? Is the path to the toilet clear at night? A night light along the route costs very little and removes a common cause of falls.

This is the highest-risk room. Look at the shower hob, the floor surface, the toilet height, and where the person will hold on. If there is no rail, a rail fixed into solid backing is usually the fastest, most effective first change.

Think about what the person will actually do: make a cup of tea, reach the fridge, carry a plate. Move everyday items to a comfortable height and make sure the path is clear. Stove safety matters if memory or vision is affected.

Rooms, risks and first fixes

AreaWhat to look forA sensible first fix
Front or back doorSteps, threshold, narrow door, no railHandrail, portable or modular ramp, better lighting
HallwayRugs, cords, tight turns, poor lightClear the floor, add night lighting, move furniture
BathroomHob, slippery floor, low toilet, nothing to holdGrab rails, shower seat, hand-held shower, non-slip treatment, raised toilet seat or frame
BedroomLow or high bed, long distance to toiletAdjust bed height, bed rail where suitable, night lighting, commode as a stop-gap
Kitchen and laundryHeavy items low down, reach, stove safetyRe-arrange items, trolley, stove safety device if appropriate

What can be done fast, and what cannot

Not every change is a two-day job. It helps to sort what is needed into three piles so you can plan around the discharge date.

Often possible in days

  • Fixed rails into solid backing where the OT recommends them
  • Hired or loaned equipment: commode, shower chair, frame, bed adjustments
  • Portable or modular ramps for short entry steps
  • Night lighting and rearranged furniture
  • Staged work: the essential change now, the rest after funding is clear

Better to slow down

  • Suction-cup rails or anything not designed to take body weight
  • Removing a hob or re-tiling a bathroom in a rush without a plan
  • Buying equipment before the OT confirms what the person will use
  • Signing a large contract on the day the hospital phones

The 60-second readiness check

  • There are steps or a threshold at the main entry
  • The bathroom has a shower hob or a slippery floor
  • There is nothing solid to hold in the bathroom
  • The toilet is low or hard to get up from
  • The path from bed to toilet is dark at night
  • The doors are narrow for a frame or wheelchair
  • We do not know what equipment the hospital is organising
  • Nobody has measured or photographed the rooms yet

Who pays? Sort it in parallel, not in sequence

Hospital discharge does not come with its own funding stream for home changes, so the money question depends on the person. For an NDIS participant, the plan and the support coordinator matter. For an older person assessed through My Aged Care, the Support at Home program and its AT-HM scheme may be relevant. For everyone else, it is usually private. Some state equipment schemes can supply certain items to eligible people. Ask the hospital OT or social worker what applies. For the detail on each pathway, see our guide to how home modifications are funded.

Do not let funding block the safety basics

Where the risk is clear, such as a missing rail or a trip hazard at the door, many families choose to fix the immediate issue privately and sort permanent funding afterwards. Keep receipts and the OT's notes so you have the evidence if funding becomes available later.

The week of discharge: a simple run sheet

  1. Two days before

    Confirm the date with the ward. Check that equipment has been delivered or booked. Do a final walk-through with the tape measure.

  2. The day before

    Move bed and furniture for the planned route. Charge phones, test night lights, put emergency numbers on the fridge.

  3. Discharge day

    Ask for a written discharge summary, medicines list and follow-up appointments. Take a photo of any instructions.

  4. First night

    Walk the route once with the person if you can. Note what felt awkward. Small tweaks matter.

  5. First week

    Book the OT or community review. Write down what is hardest and send it to the OT, or to us, to plan the permanent changes.

Myths families believe at this stage

"We will just manage for a few weeks."

Many people do. But the first weeks are when the risk of a fall is often highest. A rail and a night light cost little and are worth doing even for a short stay at home.

"The hospital will sort everything."

Hospitals organise clinical equipment and referrals. The house itself, and the work on it, is usually up to you and your funding pathway.

"We need to renovate the bathroom before they come home."

Usually not. A rail, a shower seat and a hand-held shower can make a bathroom workable while a larger change is planned.

"Nothing can be done without the OT."

Obvious safety basics, like clearing trip hazards and adding lighting, can start now. Anything fixed to the structure should follow the OT's advice.

How we help when time is short

We can visit quickly, measure the key route, photograph the rooms for the OT, and quote the essential changes in stages. We will tell you which items are fast, which are not, and which need approval. If the person is being discharged to a rented home, we can supply what an owner usually needs for approval. Start with a free site visit or see our hospital discharge page for therapists.

Your first week: a simple action plan

You do not have to do everything at once. This sequence keeps things moving without overwhelm.

  1. Step 1

    Ask the hospital OT for their home recommendations in writing.

  2. Step 2

    Walk the route from the front door to the bed and bathroom.

  3. Step 3

    Clear rugs, cords and clutter first.

  4. Step 4

    Book the quick wins: rails, a second step rail, lighting.

  5. Step 5

    Confirm what equipment is being hired or supplied, and who delivers it.

  6. Step 6

    Keep a spare key and a list of contacts for the first week.

Plain-English glossary

Discharge planner
The hospital staff member who coordinates the move home.
Interim equipment
Short-term items such as a shower chair or commode.
Transfer
Moving between bed, chair, toilet or shower.
Care package
Services arranged to support someone at home after hospital.

What happens at a Nemco site visit

If you would like a second pair of eyes, we visit the home, listen to the person first and look at the spaces they actually use. We take measurements and photos, check access for tradespeople and talk through the options in plain language, including simpler or cheaper ones where they will do the job. You then receive a written, itemised quote that your therapist, plan manager or family can read and compare. There is no obligation to proceed, and we will tell you if something is outside what we do. We also explain what each step involves for the person living there, how long the work is likely to take, whether the home can be used while it happens, and who to call if something does not work as expected after handover.

What to have ready

  • Any therapist or hospital letters, or the name of the person coordinating care
  • Photos or a rough sketch of the rooms involved
  • A list of the times of day the person finds things hardest
  • Landlord, strata or owner details if the home is not owned
  • Your funding pathway, if you know it, or the name of the plan manager

When to bring in a professional sooner

If the person has had a recent fall, a change in health, a hospital stay or a new diagnosis, or if you are unsure whether a change is safe, speak to an occupational therapist or doctor before making changes. A quick conversation early can save money and avoid doing the wrong thing.

Questions to talk through at home

  • Which tasks will be hardest in the first fortnight?
  • Who will be at home, and when?
  • Which changes must be done before discharge and which can wait?
  • What is the backup plan if the date moves?

Last checked: November 2026. Rules, prices and program details change, so confirm with the source before you act. This guide is general. It does not replace your discharge team's advice.

Common questions

How quickly can rails or a ramp be installed?

It depends on the work and the walls, but simple rails and portable ramps can often be done quickly once the position is agreed. Larger changes need more time and sometimes approval.

What if the date changes?

Plan the route and the essentials now, then adjust. Staged work copes well with a moved date.

Do we need the OT before we fix a rail?

It is best to follow the OT's advice on position, because the right place depends on how the person stands, turns and transfers.

Can we rent equipment instead of buying?

Often yes, especially for short-term use. Ask the hospital OT or a hire supplier what suits the situation.

Is this covered by funding?

It depends on the person's pathway. See our funding guide, and ask the hospital OT or social worker what applies.

Written by the Nemco Group team. We install home modifications, assistive technology and security across Sydney and Newcastle. This article is general information, not clinical or financial advice.
The detail

Who comes into your home matters.

If you would like to see a certificate before the visit, ask.

Licence

Security Master Licence 000111610

Security installation is done under this NSW licence.

Insurance

Fully insured

Cover for the work we carry out.

Screening

NDIS Worker Screening Certificate

Held by everyone who comes to your home.

Screening

Working With Children Check and police check

Also held by everyone who comes to your home.

Business

Company registered in 2013

Trades

Licensed electrical and building trades

Carried out by appropriately licensed trades.

What we stand for

Four promises we can keep.

Principle

The therapist's plan is the plan

We build to the recommendation and ask before changing it.

Principle

Plain language, in writing

Quotes, summaries and handovers you can re-read.

Principle

One accountable team

If something is wrong, you call us, not three trades.

Principle

A free visit, no strings

A written summary whether or not you go ahead.

Service area

Do we cover your suburb?

Type your suburb or postcode. We work from Greater Sydney through the Central Coast and Lake Macquarie to Newcastle, and we will tell you honestly if we cannot reach you.