NDIS, Aged Care & Private · Home mods · Assistive tech · Smart home · SecurityMon–Sat 9am–6pm04888 NEMCO
GROUPSMART. SAFE. SECURE.
Guides · 9 min · 12 November 2026

Before you sign: the NSW home modification contract checklist that protects your money

Deposits, cooling-off, insurance, warranties, licences and the clause that locks you in. What NSW law says about building contracts, and what to check on every home modification quote.

Family members showing an older man something on a phone
The short version
  • In NSW a written contract is required for residential building work over $5,000. Over $20,000 you get extra protections.
  • The maximum deposit is 10 per cent, and for work over $20,000 insurance must be in place before any payment.
  • Statutory warranties run six years for major defects and two years for others, even if the contract is silent.
  • The builder must hold the right licence, with the licence holder's name and number in the contract.

A home modification is rarely the biggest building job in a person's life, but it is often the one with the highest stakes. The person using the bathroom, the ramp or the lift depends on it every day. The money may be from a funding program, from savings or from a family. And people are often under pressure from a hospital discharge date, a plan deadline or a fall that has just happened. That is exactly when it is easiest to sign something you should have read twice.

This guide explains what NSW law says about residential building contracts, in language for people who are not lawyers, and gives you a checklist to use on any quote.

General information only

This is a summary of public information from the NSW Government. It is not legal advice. For your situation, check with NSW Fair Trading, a lawyer or a community legal centre. The Disability Gateway can help you find a legal service if you need support with an agreement.

The thresholds that matter

$5,000A written contract is required above this (including GST)
$20,000Extra contract requirements and insurance apply above this
10%The maximum deposit on a home building contract

The thresholds can apply to the price of the contract, or where the price is not known, to the reasonable market cost of labour and materials. In plain terms: if the job costs more than a few thousand dollars, expect a proper written contract, not a quote on the back of a business card.

Small jobs ($5,000 to $20,000)

A "small job" contract is required. It must be in writing, dated and signed by each party, and include the basic details:

  • The names of the parties, and the contractor's licence details
  • A description of the work, with plans if there are any
  • The contract price
  • A quality of construction clause

The builder must also provide the NSW Consumer Building Guide before the contract for work over $5,000.

Large jobs (over $20,000)

For bigger jobs the law asks for more, and it is worth knowing what you are entitled to.

  • The price on the first page, along with plans and specifications
  • Statutory warranties set out in the contract
  • A progress payment schedule so you pay as stages are completed
  • A termination clause
  • A checklist of items the owner must be able to answer "yes" to
  • A cooling-off period of five clear business days after you receive a copy of the contract

The builder must give you a copy of the signed contract within five business days. Weekends, NSW public holidays and 27 to 31 December are excluded from business-day counts.

Deposits and insurance: the money rules

This is where people most often lose money. The rules are straightforward:

Safe habits

  • Pay a deposit of no more than 10 per cent of the contract price
  • Check the home building compensation (warranty) insurance certificate before paying, for work over $20,000
  • Verify the certificate with the insurer or through HBC Check
  • Pay in stages that match completed work, as set out in the payment schedule

Warning signs

  • Pay a large "booking fee" or "materials deposit" up front
  • Pay anything on work over $20,000 before the insurance is in place
  • Agree to a payment schedule that front-loads the money
  • Hand over cash with no receipt

For work covered by the Home Building Compensation Scheme, a contractor cannot ask for a deposit or any other payment until the insurance is in place and the certificate has been given to you. If someone asks for money earlier than that, say no and check with NSW Fair Trading.

Statutory warranties: your safety net

Under NSW law there are warranties that apply to residential building work even if they are not written into your contract:

6 yearsfor major defects, from completion
2 yearsfor all other defects, from completion

"Completed" is defined by the contract. If the contract does not say, it is when the work is fit for its intended purpose and free of major defects. If something goes wrong, tell the builder in writing as soon as you notice, and keep the evidence. Do not wait until the warranty is nearly over.

Licences: who is allowed to do what

The contractor must hold a valid NSW contractor licence for the work. The licence holder's name and number must be in the contract. A licence held by an individual does not cover that person's company or partnership, so the company or partnership needs its own. You can check licences online before you sign, and you should.

Some work needs additional licences. Plumbing, drainage, electrical and waterproofing are examples. A bathroom modification often involves several trades. Ask who is licensed for each part, and who is responsible for the whole job.

The home modification extras

Home modifications are different from a general renovation in three ways.

1. The plan has to match the person

The scope should come from an OT's recommendation or the person's assessed needs, not from the builder's catalogue. If the contract does not refer to the report, ask for it to be added.

2. Funding changes the rules of the game

If you are using NDIS or Support at Home funding, the quote must satisfy the funder. That can mean itemised pricing, a link to the assessment and a payment structure that fits the plan manager's processes. See our guide to how home modifications are funded.

3. Ownership of plans and drawings

The NDIS suggests checking who owns the intellectual property in the drawings and what licence you receive. If you cannot give the plans to another builder, you may be locked in. Ask the question before signing.

If it is not in the contract, it is a promise. If it is a promise, you cannot enforce it.

The contract checklist

Print this and tick it off at the table before you sign.

  • The contractor's name, licence number and ABN match what you checked online
  • The scope of work is specific and refers to the OT report where there is one
  • The price is clear, with GST, and says what is and is not included
  • The deposit is no more than 10 per cent
  • For work over $20,000, the insurance certificate is attached and verified
  • The payment schedule matches completed stages
  • Start and finish dates, and what happens if there are delays
  • How variations are priced and approved in writing
  • Statutory warranties are noted and the warranty process is clear
  • You know who owns plans and drawings, and what you can do with them
  • The cooling-off period (for work over $20,000) is clear
  • You have a copy of the signed contract

Red flags to walk away from

  • They want cash, or a large deposit, today
  • They cannot or will not show a licence number
  • The quote is one line with no breakdown
  • They push you to sign before you have read it
  • They say insurance is "not needed" for a large job
  • They want to change the scope after the OT has signed off
  • They avoid putting promises in writing
  • They do not mention the warranty or the cooling-off period

If something goes wrong

If the work is poor, late or different from what was agreed, act early and in writing.

  1. Document it

    Photos, dates and a list of what is wrong. Keep emails and messages.

  2. Tell the contractor in writing

    Describe the issue and ask for a fix by a specific date.

  3. Check warranty and insurance

    Statutory warranties and home building compensation may apply. Check your options.

  4. Talk to NSW Fair Trading

    They can explain your rights and may help with a complaint.

  5. Get advice if the amount is large

    A community legal centre or lawyer can help, especially if you are using funding that has conditions.

Myths we hear

"A verbal agreement is enough for a small job."

For work over $5,000, the law requires a written contract. Even for smaller jobs, put the scope and price in writing.

"The funding approval is the contract."

Funding approval says who pays. The contract says who does what, for how much, and what happens if it goes wrong.

"Warranties only apply if I paid for them."

Statutory warranties apply to residential building work even if they are not written into your contract.

"I do not need to check the licence, they look professional."

Check every time. It takes a couple of minutes and can save you a great deal.

How we work

Our quotes are itemised and written to match the OT's recommendation. We state who is doing what, under which licence, and what is and is not included. We are happy for you to take the quote and contract to a legal service or an OT before you decide. See our page on scope and licensing, or start with a free site visit.

Your first week: a simple action plan

You do not have to do everything at once. This sequence keeps things moving without overwhelm.

  1. Step 1

    Read the contract slowly before signing.

  2. Step 2

    Check the licence and insurance details.

  3. Step 3

    Confirm the scope in plain language and measurements.

  4. Step 4

    Check the payment schedule against progress.

  5. Step 5

    Ask how variations are priced and approved.

  6. Step 6

    Keep a signed copy and all emails.

Plain-English glossary

Variation
A change to the agreed work, with a change in price or time.
Deposit
A payment before work starts, limited by law for some contracts.
Progress payment
A payment tied to completed stages.
Defects period
The time in which faults must be fixed at no cost.

What happens at a Nemco site visit

If you would like a second pair of eyes, we visit the home, listen to the person first and look at the spaces they actually use. We take measurements and photos, check access for tradespeople and talk through the options in plain language, including simpler or cheaper ones where they will do the job. You then receive a written, itemised quote that your therapist, plan manager or family can read and compare. There is no obligation to proceed, and we will tell you if something is outside what we do. We also explain what each step involves for the person living there, how long the work is likely to take, whether the home can be used while it happens, and who to call if something does not work as expected after handover.

What to have ready

  • Any therapist or hospital letters, or the name of the person coordinating care
  • Photos or a rough sketch of the rooms involved
  • A list of the times of day the person finds things hardest
  • Landlord, strata or owner details if the home is not owned
  • Your funding pathway, if you know it, or the name of the plan manager

When to bring in a professional sooner

If the person has had a recent fall, a change in health, a hospital stay or a new diagnosis, or if you are unsure whether a change is safe, speak to an occupational therapist or doctor before making changes. A quick conversation early can save money and avoid doing the wrong thing.

Questions to talk through at home

  • What exactly is included and excluded?
  • What is the start date and the finish date?
  • Who is on site and who is the contact?
  • What happens if there is a dispute?

Last checked: November 2026. Rules, prices and program details change, so confirm with the source before you act. Thresholds, warranty periods and deposit limits come from NSW Government pages on residential building contracts at that date.

Common questions

When do I need a written contract in NSW?

For residential building work with a price over $5,000 (including GST), or where the reasonable cost of labour and materials is over $5,000.

What is the maximum deposit?

10 per cent of the contract price.

Do I need insurance for a home modification?

Home building compensation insurance is required for residential building work valued over $20,000. Check the certificate before you pay.

How long are statutory warranties?

Six years for major defects and two years for other defects, from completion.

Is there a cooling-off period?

For contracts over $20,000, yes: five clear business days after you receive a copy of the contract.

Written by the Nemco Group team. We install home modifications, assistive technology, smart home and security across Sydney and Newcastle. This article is general information, not clinical, legal or financial advice.
The detail

Who comes into your home matters.

If you would like to see a certificate before the visit, ask.

Licence

Security Master Licence 000111610

Security installation is done under this NSW licence.

Insurance

Fully insured

Cover for the work we carry out.

Screening

NDIS Worker Screening Certificate

Held by everyone who comes to your home.

Screening

Working With Children Check and police check

Also held by everyone who comes to your home.

Business

Company registered in 2013

Trades

Licensed electrical and building trades

Carried out by appropriately licensed trades.

What we stand for

Four promises we can keep.

Principle

The therapist's plan is the plan

We build to the recommendation and ask before changing it.

Principle

Plain language, in writing

Quotes, summaries and handovers you can re-read.

Principle

One accountable team

If something is wrong, you call us, not three trades.

Principle

A free visit, no strings

A written summary whether or not you go ahead.